United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMIron Javelin Emerald
Iron Javelin Emerald is a 72.0 MW solar request withdrawn in the PJM interconnection queue, in Greene County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-367A
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Developer
- Emerald Renewable LLC
- Connection point (POI)
- Franklin 138 kV II
- Location
- Greene County, Pennsylvania
- Technology
- Solar: 72.0 MW
- Total requested
- 72.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 3 March 2025
- Proposed online date
- September 2023
- Withdrawn
- December 2025
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Greene County
- Solar + storage project AI2-443, Greene CountySolar + storage Β· 300 MW Β· in study
- Solar project AH2-295, Greene CountySolar Β· 40.0 MW Β· in study
- Hilltop Energy Center FacilityGas Β· 515 MW Β· built
- Hilltop Energy Center FacilityGas Β· 130 MW Β· built
- Hilltop Energy Center FacilityGas Β· 20.0 MW Β· built
- Hatfield Ferry, Units 1, 2, and 3Coal Β· 1,710 MW Β· withdrawn
- Renaissance Energy CenterGas Β· 1,140 MW Β· withdrawn
- Gas project AC2-025, Greene CountyGas Β· 1,140 MW Β· withdrawn
- Greene Energy Resource Recovery ProjectCoal Β· 525 MW Β· withdrawn
- Coal project L10, Greene CountyCoal Β· 520 MW Β· withdrawn
- Battery storage project AH2-279, Greene CountyBattery storage Β· 150 MW Β· withdrawn
- Solar + storage project AH1-367, Greene CountySolar + storage Β· 74.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem