United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
COAL Β· PJMCoal project L10, Greene County
Coal project L10, Greene County is a 520 MW coal request withdrawn in the PJM interconnection queue, in Greene County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2003 (completed)
- Withdrawn / abandonedJul 2004 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- L10
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Hatfield 500 kV
- Location
- Greene County, Pennsylvania
- Technology
- Coal: 520 MW
- Total requested
- 520 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 12 November 2003
- Proposed online date
- December 2006
- Withdrawn
- July 2004
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Greene County
- Solar + storage project AI2-443, Greene CountySolar + storage Β· 300 MW Β· in study
- Solar project AH2-295, Greene CountySolar Β· 40.0 MW Β· in study
- Hilltop Energy Center FacilityGas Β· 515 MW Β· built
- Hilltop Energy Center FacilityGas Β· 130 MW Β· built
- Hilltop Energy Center FacilityGas Β· 20.0 MW Β· built
- Hatfield Ferry, Units 1, 2, and 3Coal Β· 1,710 MW Β· withdrawn
- Renaissance Energy CenterGas Β· 1,140 MW Β· withdrawn
- Gas project AC2-025, Greene CountyGas Β· 1,140 MW Β· withdrawn
- Greene Energy Resource Recovery ProjectCoal Β· 525 MW Β· withdrawn
- Battery storage project AH2-279, Greene CountyBattery storage Β· 150 MW Β· withdrawn
- Solar + storage project AH1-367, Greene CountySolar + storage Β· 74.0 MW Β· withdrawn
- Iron Javelin EmeraldSolar Β· 72.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem