United States › Grid › Interconnection queues › Pennsylvania
GAS · PJMRenaissance Energy Center
Renaissance Energy Center is a 1,140 MW gas request withdrawn in the PJM interconnection queue, in Greene County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedNov 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-097
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Hatfield 500kV
- Location
- Greene County, Pennsylvania
- Technology
- Gas: 1,140 MW
- Total requested
- 1,140 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 21 October 2016
- Proposed online date
- June 2021
- Withdrawn
- November 2019
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Greene County
- Solar + storage project AI2-443, Greene CountySolar + storage · 300 MW · in study
- Solar project AH2-295, Greene CountySolar · 40.0 MW · in study
- Hilltop Energy Center FacilityGas · 515 MW · built
- Hilltop Energy Center FacilityGas · 130 MW · built
- Hilltop Energy Center FacilityGas · 20.0 MW · built
- Hatfield Ferry, Units 1, 2, and 3Coal · 1,710 MW · withdrawn
- Gas project AC2-025, Greene CountyGas · 1,140 MW · withdrawn
- Greene Energy Resource Recovery ProjectCoal · 525 MW · withdrawn
- Coal project L10, Greene CountyCoal · 520 MW · withdrawn
- Battery storage project AH2-279, Greene CountyBattery storage · 150 MW · withdrawn
- Solar + storage project AH1-367, Greene CountySolar + storage · 74.0 MW · withdrawn
- Iron Javelin EmeraldSolar · 72.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem