United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· WEST

Onshore wind project 2022-G12

Onshore wind project 2022-G12 is a 71.0 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2022-G12
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Miracle Mile - Snowy Range 230-kV
Technology
Wind: 71.0 MW
Total requested
71.0 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
16 August 2022
Proposed online date
December 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem