United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA (2024 requests) — page 23
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Altamaha Green Energy Other |
70.0 MW | In study |
| Solar project 962965, Lenoir County Solar |
70.0 MW | In study |
| Battery storage project GEN-2024-SR8, Greeley County Battery storage |
70.0 MW | In study |
| Solar project 963472, Robeson County Solar |
70.0 MW | In study |
| Solar project PIS058, Emery County Solar · PacifiCorp |
70.0 MW | In study |
| Symank Solar Solar · BT Symank Solar, LLC |
66.6 MW | In study |
| Solar project 963044, Cumberland County Solar · Duke Energy Progress LLC |
65.0 MW | In study |
| Solar project J3529, Mahnomen County Solar |
64.0 MW | In study |
| Gas project GEN-2024-019, Gage County Gas |
62.0 MW | In study |
| Dewdrop Wind Onshore wind · Dewdrop Wind LLC |
62.0 MW | In study |
| Gas project GEN-2024-017, Lancaster County Gas |
62.0 MW | In study |
| Gas project PIS090, Utah County Gas · PacifiCorp |
62.0 MW | In study |
| Little Star Solar Solar · RWE Clean Energy Development, LLC |
61.6 MW | In study |
| Beaverhead Solar SLF Solar + storage · Beaverhead Solar, LLC |
61.5 MW | In study |
| Beaverhead Storage SLF Solar + storage · Beaverhead Solar, LLC |
61.5 MW | In study |
| Centennial Solar Solar · Centennial AD 8 LLC |
61.4 MW | In study |
| Battery storage project S0029, Crook County Battery storage |
60.8 MW | In study |
| Fallstone Solar SLF Solar + storage · Fallstone Solar, LLC |
60.6 MW | In study |
| Hondo Arroyo Solar Solar + storage · Hondo Creek Solar, LLC |
60.4 MW | In study |
| Tipperary Solar Solar · Tippsol |
60.2 MW | In study |
| Stonewall Solar Solar + storage · Stonewall PV, LLC |
60.2 MW | In study |
| Cayuga Solar Solar · Cayuga Lake Solar, LLC |
60.0 MW | In study |
| Gas project 657, Muhlenberg County Gas |
60.0 MW | In study |
| Taylor Creek Two Solar |
60.0 MW | In study |
| Kce NY 21 Battery storage · KCE NY 21, LLC |
60.0 MW | In study |
| Town Line Solar Phase II Solar + storage · RWE Solar Development, LLC |
60.0 MW | In study |
| Battery storage project IC-1267, Floyd County Battery storage |
57.5 MW | Agreement signed |
| Onshore wind project J3592, Sunflower County Onshore wind |
57.0 MW | In study |
| Battery storage project S0030, Crook County Battery storage |
55.0 MW | In study |
| Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3 Gas |
55.0 MW | In study |
| Gas project 656, Benton County Gas |
54.0 MW | In study |
| Donna BESS Solar + storage · Donna Solar LLC |
53.9 MW | In study |
| Paloma Energy Center BESS Solar + storage · Harrison Street Development, LLC |
53.6 MW | In study |
| Battery storage project GEN-2024-SR13, Bryan County Battery storage |
52.2 MW | In study |
| Solar project 111, Polk County Solar |
52.0 MW | In study |
| Fluvanna Max BESS SLF Solar + storage · Fluvanna Max Solar LLC |
51.8 MW | In study |
| Findley BESS Solar + storage · Gransolar Texas Sixteen, LLC |
51.7 MW | In study |
| Solar project 268, Richland County Solar |
51.0 MW | In study |
| Battery storage project 24-242, Polk County Battery storage |
50.0 MW | In study |
| Solar project 956852, Darlington County Solar |
50.0 MW | In study |
| Gas project 2024-G6, Mohave County Gas |
50.0 MW | In study |
| Solar project 963122, Laurens County Solar |
50.0 MW | In study |
| Battery storage project 956218, Nash County Battery storage · Duke Energy Progress LLC |
50.0 MW | In study |
| Sandlot IFB Battery storage · Sandlot Energy LLC |
50.0 MW | In study |
| Battery storage project GEN-2024-SR17, Kay County Battery storage |
50.0 MW | In study |
| Surplus; G905 Other |
50.0 MW | In study |
| Solar project J2891, Kenosha County Solar |
50.0 MW | In study |
| Battery storage project BHCT G50, Pueblo County Battery storage · Black Hills Colorado Electric, LLC |
50.0 MW | In study |
| Azalea Wind 1 Onshore wind · Azalea Wind LLC |
50.0 MW | In study |
| Azalea Wind 2 Onshore wind · Azalea Wind LLC |
50.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)436 · 104.7 GW
- MISO (Midcontinent)290 · 62.9 GW
- West (non-ISO utilities)192 · 45.5 GW
- Southeast (non-ISO utilities)178 · 35.0 GW
- SPP (Southwest Power Pool)81 · 18.0 GW
- NYISO (New York)89 · 15.6 GW
- ISO-NE (New England)15 · 3,285 MW
- PJM (Mid-Atlantic, Midwest)2 · 95.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)