United States › Grid › Interconnection queues › Nebraska
BATTERY STORAGE · SPPBattery storage project GEN-2024-SR8, Greeley County
Battery storage project GEN-2024-SR8, Greeley County is a 70.0 MW battery storage request in interconnection study in the SPP interconnection queue, in Greeley County, Nebraska, connecting to NPPD.
Queue statusIn planning
- PlanningQueued Apr 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-SR8
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Spalding to North Loup 115kV
- Location
- Greeley County, Nebraska
- Technology
- Battery: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 3 April 2024
- Proposed online date
- December 2026
Location
Marker shows the centre of Greeley County; the queue data does not give exact sites.
Other requests in Greeley County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem