United States › Grid › Interconnection queues › Georgia

OTHER · SOUTHEAST

Altamaha Green Energy

Altamaha Green Energy is a 70.0 MW other request in interconnection study in the Southeast interconnection queue, in Wayne County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Aug 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-195
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Jessup – Ludowici Primary 115 kV TL
Location
Wayne County, Georgia
Technology
Other: 70.0 MW
Total requested
70.0 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
20 August 2024
Proposed online date
March 2028

Location

Marker shows the centre of Wayne County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Wayne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem