United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in ERCOT (Texas) — page 20
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Pham BESS Battery storage · ASB1, LLC |
133 MW | In study |
| Halcon Storage Battery storage · TX BESS A LLC |
133 MW | In study |
| Double A Solar SLF Solar + storage · Double A Solar, LLC |
133 MW | In study |
| Kodiak AGR1 Other · Hunt Energy Network, LLC |
132 MW | In study |
| Maratua Solar Solar · BDPU Solar Maratua, LLC |
131 MW | In study |
| Pecan Prairie South Solar · ConnectGen Operating LLC |
131 MW | In study |
| Starlight Solar Solar + storage · Mills Tx Solar LLC |
131 MW | In study |
| Anagram Solar Solar · Anagram Solar |
131 MW | In study |
| White Wing Storage Solar + storage · White Wing Solar, LLC |
130 MW | In study |
| Rosebud Solar SLF Solar + storage · Rosebud Solar, LLC |
130 MW | In study |
| BRP Octans BESS Battery storage · BRP OCTANS BESS LLC |
130 MW | In study |
| Silverbell Storage Solar + storage · Silverbell Energy Center, LLC |
129 MW | In study |
| Salazar BESS Battery storage · Salazar Energy Storage LLC |
128 MW | In study |
| San Gabriel Storage Solar + storage · San Gabriel Solar LLC |
128 MW | In study |
| White Wing Solar Solar + storage · White Wing Solar, LLC |
127 MW | In study |
| Hillboro BESS Wind + storage · Abei Energy Green XI LLC |
127 MW | In study |
| Sandford Solar Solar + storage · BT Sandford Solar, LLC |
126 MW | In study |
| Bunting Solar Project Solar · H4 Solar Project LLC |
126 MW | In study |
| Solar Star North Herty Storage Battery storage · Solar Star North Herty Storage, LLC |
126 MW | In study |
| Dolomite Storage Battery storage · BT Wilson Storage, LLC |
126 MW | In study |
| Benitoite Storage Battery storage · BT Van Storage, LLC |
126 MW | In study |
| Silverbell Solar Solar + storage · Silverbell Energy Center, LLC |
126 MW | In study |
| Elm Flats Solar SLF Solar + storage · Orca Falls Solar, LLC |
126 MW | In study |
| Zodiac Storage Battery storage · Grenergy USA |
126 MW | In study |
| Becerra Creek Storage 1 Battery storage · Bordas Renewable Energy, LLC |
126 MW | In study |
| Spinner Energy Storage Battery storage · GCI Wolf Energy Storage, LLC |
126 MW | In study |
| Becerra Creek Storage 2 Battery storage · Bordas Renewable Energy, LLC |
126 MW | In study |
| Momentum Hazy Jane BESS Battery storage · MOMENTUM HAZY JANE, LLC |
126 MW | In study |
| Three Ranches Solar Solar + storage · Three Ranches Energy LLC |
126 MW | In study |
| DMF Sagerton Solar SLF Solar + storage · Double Mountain Fork LLC |
126 MW | In study |
| Momentum Stout BESS Battery storage · Momentum STOUT, LLC |
126 MW | In study |
| Momentum Bock Battery storage · Momentum Bock, LLC |
125 MW | In study |
| Jumping Cactus Storage Battery storage · Dove Run Solar Project, LLC |
125 MW | In study |
| Saluga Ranch Storage Battery storage · Saluga Ranch Energy, LLC |
125 MW | In study |
| Houston County BESS Battery storage · Houston ESS, LLC |
125 MW | In study |
| TE Smith Storage 2 Battery storage · Smith II Battery Storage, LLC |
125 MW | In study |
| Journey Solar Solar · Journey Solar, LLC |
125 MW | In study |
| EMPower Odessa (TEF - Due Diligence) Gas · EMPOWER USA, LLC |
123 MW | In study |
| Sleepy Hollow BESS Battery storage · Sleepy Hollow BESS, LLC |
123 MW | In study |
| Great Hambino BESS Battery storage · Atascosa BESS, LLC |
123 MW | In study |
| Signal Hill BESS I Battery storage · Signal Hill Generating LLC |
123 MW | In study |
| Prairie Blossom Storage Battery storage · Prairie Blossom Storage, LLC |
123 MW | In study |
| Arnold Hills Storage Battery storage · Arnold Hills Storage, LLC |
123 MW | In study |
| Dove Wing Storage Battery storage · Dove Run Solar Project, LLC |
122 MW | In study |
| Sayle Solar SLF Solar + storage · Sayle Solar LLC |
122 MW | In study |
| Morning Glory Solar Solar · Armadillo Solar, LLC |
122 MW | In study |
| Sayle Storage SLF Solar + storage · Sayle Storage LLC |
122 MW | In study |
| BRP Ampato BESS Battery storage · BRP Ampato BESS LLC |
122 MW | In study |
| Bronc Rodeo Solar Project Solar · Energiekontor US Texas SP 16 LLC |
122 MW | In study |
| Nymphaea Solar Solar + storage · Nymphaea Solar, LLC |
121 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)