BATTERY STORAGE · ERCOT

Halcon Storage

Halcon Storage is a 133 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Starr County, Texas.

Queue statusIn planning
  1. PlanningQueued May 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0241
Grid region
ERCOT (Texas)
Developer
TX BESS A LLC
Connection point (POI)
Tap 138kV 8957 Central Lopeno - 80106 Falcon Dam
Location
Starr County, Texas
Technology
Battery: 133 MW
Total requested
133 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
22 May 2023
Proposed online date
May 2028

Location

Marker shows the centre of Starr County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Starr County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem