United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Momentum Bock

Momentum Bock is a 125 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Lamar County, Texas.

Queue statusIn planning
  1. PlanningQueued Sep 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0506
Grid region
ERCOT (Texas)
Developer
Momentum Bock, LLC
Connection point (POI)
1771 LAMAR BLOSSOM 138kV
Location
Lamar County, Texas
Technology
Battery: 125 MW
Total requested
125 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
4 September 2024
Proposed online date
April 2028

Location

Marker shows the centre of Lamar County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Lamar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem