United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

TE Smith Storage 2

TE Smith Storage 2 is a 125 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Rockwall County, Texas.

Queue statusIn planning
  1. PlanningQueued Apr 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0418
Grid region
ERCOT (Texas)
Developer
Smith II Battery Storage, LLC
Connection point (POI)
2478 Royse 345kV
Location
Rockwall County, Texas
Technology
Battery: 125 MW
Total requested
125 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
15 April 2024
Proposed online date
August 2027

Location

Marker shows the centre of Rockwall County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Rockwall County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem