United States › Grid › Interconnection queues › Montana
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Montana — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project 431, Wheatland County Solar + storage |
50.0 MW | In study |
| Solar + storage project 417, Wheatland County Solar + storage |
50.0 MW | In study |
| Gas project 377, Silver Bow County Gas |
36.0 MW | Paused / redesign |
| Solar + storage project 340, Yellowstone County Solar + storage |
20.0 MW | In study |
| Gas project 441, Lewis And Clark County Gas |
12.0 MW | In study |
| Hydro project 458, Broadwater County Hydro |
10.4 MW | In study |
| Hydro project T2-077, Bighorn County Hydro |
8.0 MW | In study |
| Solar + storage project 440, Lewis And Clark County Solar + storage |
4.6 MW | In study |
| Hydro project 457, Lewis And Clark County Hydro |
2.2 MW | In study |
| Solar project 454, Gallatin County Solar |
2.0 MW | In study |
| Other project G0710, Flathead County Other |
1.6 MW | In study |
| Battery storage project G1085, Flathead County Battery storage |
0.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)