United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in NYISO (New York) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Brusselville Solar Energy Center Solar + storage · Brusselville Solar, LLC |
170 MW | In study |
| Basecamp BESS Battery storage · RWE Solar Development, LLC |
170 MW | In study |
| Maple Harvest Wind Onshore wind · Maple Harvest Wind |
162 MW | In study |
| Yellow Barn Solar Solar · Yellow Barn Solar, LLC |
160 MW | In study |
| Amsterdam Solar Solar · RWE Solar Development, LLC |
150 MW | In study |
| Alcazar 2 Battery storage · Terra-Gen Development Company, LLC |
150 MW | In study |
| Oakdale Battery Storage LLC Battery storage · BayWa r.e Projects LLC. |
150 MW | In study |
| Levy Grid, LLC Battery storage · Levy Grid, LLC |
150 MW | In study |
| Bay Breeze solar Solar · Bay Breeze Solar, LLC |
150 MW | In study |
| NY Chateaugay 0 Willis Rd Storage Battery storage · Chateauguay River, LLC |
150 MW | In study |
| Gowanus Energy Storage Battery storage · Astoria Generating Company, L.P. |
150 MW | In study |
| Aria Storage 2 Battery storage · Terra-Gen Development Company, LLC |
150 MW | In study |
| Valcour Storage Battery storage · Emeren US, LLC |
150 MW | In study |
| Arch 4 Battery storage · Terra-Gen Development Company, LLC |
150 MW | In study |
| Lincoln Park DG, LLC Battery storage · BayWa r.e Projects LLC. |
150 MW | In study |
| Kce NY 37 Battery storage · KCE NY 37, LLC |
150 MW | In study |
| Farmhouse BESS Battery storage · RWE Solar Development, LLC |
150 MW | In study |
| Prattsburgh Wind Farm Onshore wind · Prattsburgh Wind, LLC |
147 MW | In study |
| Ramadi Utility Storage Battery storage · Ramadi LLC |
140 MW | In study |
| Oxbow Hill Solar Solar · Oxbow Hill Solar, LLC |
140 MW | In study |
| Palladium Storage Battery storage · Palladium Storage LLC |
140 MW | In study |
| White Creek Solar Solar · White Creek Solar, LLC |
135 MW | In study |
| Fraser Energy Storage Battery storage · EDF Renewables Development, Inc. |
135 MW | In study |
| Marathon BESS Battery storage · Marathon Power |
135 MW | In study |
| Alabama Solar Park LLC Solar · Alabama Solar Park LLC |
130 MW | In study |
| Cohocton Solar + storage · ACE DevCo NC, LLC |
130 MW | In study |
| Port Morris Energy Storage Battery storage · The NY Power Authority |
130 MW | In study |
| Heritage Wind Onshore wind · Heritage Wind, LLC |
126 MW | In study |
| Somerset Solar Solar · Somerset Solar, LLC |
125 MW | In study |
| Sugar Maple Solar Solar · Sugar Maple Solar, LLC |
125 MW | In study |
| East Setauket Energy Storage Battery storage · East Setauket Energy Storage, LLC |
125 MW | In study |
| NY38 Solar Solar · Greens Corners Solar LLC |
120 MW | In study |
| Trelina Energy Storage Battery storage · NextEra Energy Resources Interconnection Holdings, LLC |
120 MW | In study |
| Elevate Bethlehem Battery storage · Lighthouse Bethlehem, LLC |
120 MW | In study |
| Tracy Solar Energy Center Solar · Tracy Solar Energy Center, LLC |
119 MW | In study |
| Holtsville 138kV Energy Storage Battery storage · Holtsville Energy Storage, LLC |
110 MW | In study |
| High Bridge Wind Onshore wind · High Bridge Wind, LLC |
101 MW | In study |
| Flat Creek Solar Solar · Flat Creek Solar NY LLC |
100 MW | In study |
| Buffalo Road Energy Storage Battery storage · MN8 Energy Development Company LLC |
100 MW | In study |
| Coral Energy Storage Battery storage · Hanwha Q CELLS USA Corp. |
100 MW | In study |
| Riverside Solar Solar · Riverside Solar, LLC |
100 MW | In study |
| Bear Ridge Solar Solar · Bear Ridge Solar, LLC |
100 MW | In study |
| Mill Point Solar II Solar + storage · ConnectGen Montgomery County LLC |
100 MW | In study |
| South Bronx Energy Storage Battery storage · Prologis Energy LLC |
100 MW | In study |
| Marlboro Storage Battery storage · Origis Development LLC |
100 MW | In study |
| Eastwater Energy Storage Battery storage · GCI Eastwater, LLC |
100 MW | In study |
| Horseblock Energy Storage Battery storage · ACE DevCo NC, LLC |
100 MW | In study |
| Zenobe Burns LLC Battery storage · Zenobe Americas Inc. |
100 MW | In study |
| Astoria Energy Storage Battery storage · East River ESS, LLC |
100 MW | In study |
| Alcazar 1 Battery storage · Terra-Gen Development Company, LLC |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)