United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOLevy Grid, LLC
Levy Grid, LLC is a 150 MW battery storage request in interconnection study in the NYISO interconnection queue, in Erie County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Dec 2018 (current stage)
- ConsentedJan 2023 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 787
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Levy Grid, LLC
- Connection point (POI)
- Gardenville Subsation 115kV
- Location
- Erie County, New York
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Study phase
- SRIS, FS
- Queue status
- Active
- Entered queue
- 20 December 2018
- Agreement signed
- 11 January 2023
- Proposed online date
- January 2027
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Kce NY 10Battery storage · 20.0 MW · in study
- Kce NY 6Battery storage · 20.0 MW · built
- Kce NY 6Battery storage · 20.0 MW · built
- Steel Winds IIOnshore wind · 15.0 MW · built
- Steel Winds IIOnshore wind · 15.0 MW · built
- Huntley Energy StorageBattery storage · 300 MW · withdrawn
- CWW 300 WindOnshore wind · 300 MW · withdrawn
- Genesee Road Solar Energy CenterSolar · 250 MW · withdrawn
- River Road StorageBattery storage · 250 MW · withdrawn
- River Road Energy StorageBattery storage · 248 MW · withdrawn
- CWW 200 WindOnshore wind · 200 MW · withdrawn
- Dime Energy StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem