United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOKce NY 10
Kce NY 10 is a 20.0 MW battery storage request in interconnection study in the NYISO interconnection queue, in Erie County, New York, connecting to NYSEG.
Queue statusIn planning
- PlanningQueued Mar 2019 (current stage)
- ConsentedOct 2022 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 804
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- KCE NY 10, LLC
- Connection point (POI)
- Erie Substation 34.5kV
- Location
- Erie County, New York
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- FES, SIS, FS
- Queue status
- Active
- Entered queue
- 22 March 2019
- Agreement signed
- 20 October 2022
- Proposed online date
- October 2026
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Levy Grid, LLCBattery storage · 150 MW · in study
- Kce NY 6Battery storage · 20.0 MW · built
- Kce NY 6Battery storage · 20.0 MW · built
- Steel Winds IIOnshore wind · 15.0 MW · built
- Steel Winds IIOnshore wind · 15.0 MW · built
- Huntley Energy StorageBattery storage · 300 MW · withdrawn
- CWW 300 WindOnshore wind · 300 MW · withdrawn
- Genesee Road Solar Energy CenterSolar · 250 MW · withdrawn
- River Road StorageBattery storage · 250 MW · withdrawn
- River Road Energy StorageBattery storage · 248 MW · withdrawn
- CWW 200 WindOnshore wind · 200 MW · withdrawn
- Dime Energy StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem