United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOHuntley Energy Storage
Huntley Energy Storage is a 300 MW battery storage request withdrawn in the NYISO interconnection queue, in Erie County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-368
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- CEDAR HOLDCO LLC
- Connection point (POI)
- Huntley 230 kV Substation
- Location
- Erie County, New York
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Queue status
- Withdrawn
- Entered queue
- 15 October 2024
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Levy Grid, LLCBattery storage · 150 MW · in study
- Kce NY 10Battery storage · 20.0 MW · in study
- Kce NY 6Battery storage · 20.0 MW · built
- Kce NY 6Battery storage · 20.0 MW · built
- Steel Winds IIOnshore wind · 15.0 MW · built
- Steel Winds IIOnshore wind · 15.0 MW · built
- CWW 300 WindOnshore wind · 300 MW · withdrawn
- Genesee Road Solar Energy CenterSolar · 250 MW · withdrawn
- River Road StorageBattery storage · 250 MW · withdrawn
- River Road Energy StorageBattery storage · 248 MW · withdrawn
- CWW 200 WindOnshore wind · 200 MW · withdrawn
- Dime Energy StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem