United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOBasecamp BESS
Basecamp BESS is a 170 MW battery storage request in interconnection study in the NYISO interconnection queue, in Chautauqua County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Aug 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-097
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- RWE Solar Development, LLC
- Connection point (POI)
- Laona Station 115kV
- Location
- Chautauqua County, New York
- Technology
- Battery: 170 MW
- Total requested
- 170 MW
- Queue status
- Active
- Entered queue
- 26 August 2024
- Proposed online date
- February 2029
Location
Marker shows the centre of Chautauqua County; the queue data does not give exact sites.
Other requests in Chautauqua County
- South Ripley Solar and BESSSolar + storage · 270 MW · in study
- Lighthouse Energy StorageBattery storage · 250 MW · in study
- York Run SolarSolar · 90.0 MW · in study
- Dewdrop WindOnshore wind · 62.0 MW · in study
- Buttercup WindOnshore wind · 49.9 MW · in study
- Goldenrod WindOnshore wind · 39.0 MW · in study
- Cassadaga WindOnshore wind · 127 MW · built
- Cassadaga WindOnshore wind · 127 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Arkwright SummitOnshore wind · 78.4 MW · built
- Arkwright SummitOnshore wind · 78.4 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem