United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOAlcazar 2
Alcazar 2 is a 150 MW battery storage request in interconnection study in the NYISO interconnection queue, in Ulster County, New York, connecting to CHGE.
Queue statusIn planning
- PlanningQueued Aug 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-094
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHGE
- Developer
- Terra-Gen Development Company, LLC
- Connection point (POI)
- Hurley 345kV Substation
- Location
- Ulster County, New York
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Queue status
- Active
- Entered queue
- 22 August 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Ulster County; the queue data does not give exact sites.
Other requests in Ulster County
- Lincoln Park DG, LLCBattery storage · 150 MW · in study
- Marlboro StorageBattery storage · 100 MW · in study
- Alcazar 1Battery storage · 100 MW · in study
- Kce NY 34Battery storage · 100 MW · in study
- Kce NY 5Battery storage · 94.0 MW · in study
- Magruder BESSBattery storage · 20.0 MW · in study
- Alcazar Energy StorageBattery storage · 250 MW · withdrawn
- NY New Paltz 540 State Rte 32 S StorageBattery storage · 221 MW · withdrawn
- Lincoln ParkBattery storage · 150 MW · withdrawn
- Pine Hill Energy StorageBattery storage · 120 MW · withdrawn
- Highland StorageBattery storage · 115 MW · withdrawn
- Margarita StorageBattery storage · 110 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem