United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESProjects with signed interconnection agreements in ERCOT (Texas) — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Citrus Flatts BESS Battery storage · Citrus Flatts Energy Center, LLC |
101 MW | Agreement signed |
| Matagorda Solar Solar · Matagorda Solar Farm, LLC |
101 MW | Agreement signed |
| Glasgow Storage Solar + storage · Glasgow Solar LLC |
101 MW | Agreement signed |
| Carambola BESS Battery storage · SMT McAllen II LLC |
101 MW | Agreement signed |
| Paradiso BESS Battery storage · VESI 13 |
101 MW | Agreement signed |
| Lupinus Solar 3 Solar + storage · Lupinus Solar 2, LLC |
101 MW | Agreement signed |
| Picadillo BESS Battery storage · Black Mountain Energy Storage II |
101 MW | Agreement signed |
| Rutile BESS Battery storage · Rutile BESS, LLC |
101 MW | Agreement signed |
| Huisache BESS Solar + storage · Huisache Solar, LLC |
101 MW | Agreement signed |
| Long Point Storage Solar + storage · Long Point Storage, LLC |
101 MW | Agreement signed |
| BRP Diran BESS Battery storage · BRP Diran BESS LLC |
101 MW | Agreement signed |
| Hermes Solar Solar + storage · Bell 1 Solar, LLC |
100 MW | Agreement signed |
| Hermes Storage Solar + storage · Bell 1 Storage LLC |
100 MW | Agreement signed |
| Ariji BESS Battery storage · Ariji BESS, LLC |
100 MW | Agreement signed |
| DAMAZO (Second Division) SOLAR Solar · TX Gulf Solar 1 LLC |
100 MW | Agreement signed |
| Arroyo Solar Solar + storage · BT Cantwell Solar, LLC |
100 MW | Agreement signed |
| Blue Summit Energy Storage Wind + storage · NextEra Energy Interconnection Holdings, LLC |
100 MW | Agreement signed |
| Cannibal Draw Storage Solar + storage · Cannibal Draw Solar, LLC |
98.6 MW | Agreement signed |
| Midpoint Solar Solar · Midpoint Solar, LLC |
98.3 MW | Agreement signed |
| Rocinante Solar Solar + storage · Brush Country Solar Project, LLC |
95.3 MW | Agreement signed |
| Timmerman Power Plant Phase 2B Gas · Lower Colorado River Authority |
94.2 MW | Agreement signed |
| High Noon Storage Solar + storage · High Noon Solar Project, LLC |
94.0 MW | Agreement signed |
| HappyDogSolar Solar + storage · Rosula Solar LLC |
85.5 MW | Agreement signed |
| Payne Battlecreek Solar · Gransolar Texas Ten, LLC |
85.0 MW | Agreement signed |
| RedSun Solar Solar + storage · Gransolar Texas Twenty Two |
82.6 MW | Agreement signed |
| Blarney Solar Solar · Blarney Solar Project LLC |
81.0 MW | Agreement signed |
| Flying Kite Solar Solar + storage · FLYING KITE SOLAR LLC |
80.4 MW | Agreement signed |
| Big Star Storage Battery storage · RWE Solar Development, LLC |
80.0 MW | Agreement signed |
| Gaia Storage Solar + storage · Gaia Solar, LLC |
78.8 MW | Agreement signed |
| Sherbino II BESS SLF Battery storage · Phoenix Battery Storage, LLC |
77.4 MW | Agreement signed |
| Eagle Springs Solar Solar + storage · Eagle Springs Solar, LLC |
77.2 MW | Agreement signed |
| Blue Jay Solar II Solar · Blue Jay Solar I, LLC |
69.0 MW | Agreement signed |
| Starling Storage Solar + storage · Starling Storage, LLC |
63.6 MW | Agreement signed |
| Honeycomb Solar SLF Solar + storage · Honeycomb Solar, LLC |
61.4 MW | Agreement signed |
| Orange Grove BESS Solar + storage · Talitha Energy Project, LLC |
61.4 MW | Agreement signed |
| Bird Dog Energy Storage Battery storage · VESI 37 LLC |
60.4 MW | Agreement signed |
| Oriana BESS Solar + storage · Oriana Solar LLC |
60.3 MW | Agreement signed |
| Sol Marina Energy Center BESS Solar + storage · Adapture Solar Development, LLC |
57.2 MW | Agreement signed |
| Bynum Solar Project Solar · Bynum Solar Project, LLC |
56.0 MW | Agreement signed |
| Longfellow BESS I Solar + storage · CENTURY GAS PROCESSING, LLC |
55.0 MW | Agreement signed |
| Lubio Solar Solar · BDPU Solar Lubio LLC |
54.5 MW | Agreement signed |
| MRG Goody Storage Solar + storage · MRG Goody Solar Project LLC |
52.3 MW | Agreement signed |
| Ryan Energy Storage Battery storage · Ryan Storage LLC |
51.6 MW | Agreement signed |
| Lupinus Storage 3 Solar + storage · Lupinus Solar 2, LLC |
50.9 MW | Agreement signed |
| Lumberjack Storage Battery storage · EDP Renewables North America LLC |
50.9 MW | Agreement signed |
| Midpoint Storage Battery storage · Midpoint Solar, LLC |
50.9 MW | Agreement signed |
| Isaac Solar Solar · Industrial Bravo Project LLC |
50.7 MW | Agreement signed |
| Dori BQ Solar Solar + storage · Sunnyside Energy, LLC |
50.4 MW | Agreement signed |
| Red Holly Storage Solar + storage · GreenGo Energy |
50.0 MW | Agreement signed |
| Limewood Storage Solar + storage · Limewood Bell Renewables LLC |
50.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 · 119.3 GW
- CAISO (California)235 · 96.2 GW
- West (non-ISO utilities)349 · 60.6 GW
- Southeast (non-ISO utilities)192 · 37.8 GW
- SPP (Southwest Power Pool)212 · 37.6 GW
- PJM (Mid-Atlantic, Midwest)343 · 35.0 GW
- MISO (Midcontinent)187 · 28.1 GW
- ISO-NE (New England)45 · 8,609 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)