Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 12 of 46
ProjectCapacityStageConnection siteFrom
Worksop BESS
Battery storage · ARM Cedar Limited
480 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Noventum -Long Stratton
Solar + storage · Noventum Power Solar 8 Limited
460 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Shoreham
Gas · VPI Power Limited
460 MWBuilt Bolney 400kV Substation
National Grid (England & Wales)
Caithness Energy Storage
Battery storage · Baywa R.e. UK Limited
456 MWScoping Caithness Energy Storage 400Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Alderton PV & BESS Station
Solar + storage · Bnrg Albion Limited
450 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2037
Alyth
Solar + storage · Ecodev (Alyth) Ltd
450 MWScoping Alyth Solar and Battery 400/132kV
SSEN Transmission (north Scotland)
Oct 2029
Ayr Flexpower
Solar + storage · Ayr Flexpower Limited
450 MWScoping Ayr Dbb 275Kv Substation
SP Transmission (south Scotland)
Oct 2037
Blyth BESS
Battery storage · Sse Renewables Solar & Battery Holdings Limited
450 MWScoping Blyth 275kV Substation
National Grid (England & Wales)
Oct 2036
Coylton 275kV Greener Grid Park
Battery storage · Coylton Energy Limited
450 MWScoping Coylton 275kV substation
SP Transmission (south Scotland)
Oct 2037
Gateway Energy Centre Power Station
Battery storage · Gateway Energy Centre Limited
450 MWConsents Approved Coryton South 400kV Substation
National Grid (England & Wales)
Jun 2029
JG Pears
Solar + storage · Jg Pears Grid Connection Limited
450 MWBuilt High Marnham 275kV Substation
National Grid (England & Wales)
Oct 2033
Loch na Cathrach Pumped Storage Hydro
Hydro and pumped storage · Statkraft Highlands Psh Limited
450 MWConsents Approved Knocknagael 275kV
SSEN Transmission (north Scotland)
Apr 2029
New Cumnock BESS
Solar + storage · New Cumnock BESS Ltd
450 MWScoping New Cumnock 275/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Ninfield Greener Grid Park
Battery storage · Ninfield Grid Solutions Limited
450 MWScoping Ninfield 400kV Substation
National Grid (England & Wales)
Oct 2037
Yaxley GEC (Ethos Green)
Solar + storage · Yaxley Green Energy Centre Ltd
450 MWAwaiting Consents Yaxley 400kV Substation
National Grid (England & Wales)
Oct 2031
Neart Na Gaoithe Offshore Wind Farm
Offshore wind · Neart Na Gaoithe Offshore Wind Limited
448 MWBuilt Neart Na Gaoithe 220/66KV Offshore Substation
SP Transmission (south Scotland)
Cdcl
Gas · Uniper UK Limited
445 MWBuilt Cottam 400kV Substation
National Grid (England & Wales)
Enfield
Gas · Uniper UK Limited
442 MWBuilt Brimsdown 132kV Substation
National Grid (England & Wales)
Cruachan U3&4 Replacement
Hydro and pumped storage · Drax Pumped Storage Limited
440 MWBuilt Cruachan 275kV Substation
SP Transmission (south Scotland)
Hornsea Power Station 2A
Offshore wind · Breesea Limited
440 MWBuilt Hornsea Platform 2A Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 2B
Offshore wind · Soundmark Wind Limited
440 MWBuilt Hornsea Platform 2B Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 2C
Offshore wind · Sonningmay Wind Limited
440 MWBuilt Hornsea Power Station 2C Offshore platform Substation
National Grid (England & Wales)
Kell440Mw BESS
Battery storage · Care Power (Kellingley) Limited
440 MWScoping Kellingley IDNO GSP
National Grid (England & Wales)
Oct 2035
Overton440Mw BESS
Battery storage · Care Power (Overton) Limited
440 MWScoping North Humber Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2035
Pollington Hybrid
Solar + storage · Edf Energy Renewables Limited
440 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Indian Queens
Solar + storage · Gridmove Ltd
437 MWScoping Indian Queens 400kV Substation
National Grid (England & Wales)
Oct 2031
Staythorpe (BESS and PV)
Solar + storage · Sse Staythorpe Power Limited
437 MWConsents Approved Staythorpe 400kV Substation
National Grid (England & Wales)
Sep 2028
Viking Wind Farm
Onshore wind · Viking Energy Wind Farm LLP
434 MWBuilt Kergord GSP
SSEN Transmission (north Scotland)
Kenwick Solar
Solar · Anesco Limited
431 MWScoping Shrewsbury 400kV Substation
National Grid (England & Wales)
Oct 2037
Great Yarmouth
Gas · RWE Generation UK Plc
420 MWBuilt Norwich Main 132kV
National Grid (England & Wales)
Noventum - Stocksbridge
Battery storage · Noventum Power Solar 14 Limited
410 MWScoping Leeds South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Corby
Gas · Corby Power Limited
401 MWBuilt Corby 132kV Substation
National Grid (England & Wales)
Alyth Energy Storage And Solar
Solar + storage · Private Energy Partners (UK) Ltd
400 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Bicker Drove
Battery storage · Rewe 1 Limited
400 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
May 2034
Bicker Fen
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Boom Power Feckenham Generation Hub
Solar + storage · Wheaten Hill BESS Limited
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2033
Borders Wind Farm
Onshore wind · Edf Energy Renewables Limited
400 MWScoping Borders Windfarm 132kV
SP Transmission (south Scotland)
May 2033
Btgbbik01 - Bicker Fen 400Mw BESS
Battery storage · Field Bicker Fen Ltd
400 MWScoping Trent Valley South Connection Node A 400k
National Grid (England & Wales)
Oct 2039
Capenhurst
Solar + storage · Enso Green Holdings Q Limited
400 MWScoping Capenhurst 275kV Substation
National Grid (England & Wales)
Sep 2033
Cellarhead
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2033
Cellarhead Green Energy Centre
Solar + storage · S & C Energy Limited
400 MWAwaiting Consents Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2028
Cellarhead PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Manchester South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Celtic Offshore Wind Farm
Offshore wind · RWE Offshore Wind
400 MWScoping Rwe Celtic Offshore Substation
National Grid (England & Wales)
Oct 2031
Chickerell
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Chickerell 400kV Substation
National Grid (England & Wales)
Oct 2038
Chickerell Solar PV & BESS
Battery storage · Chickerell Storage Limited
400 MWConsents Approved Chickerell 400kV Substation
National Grid (England & Wales)
Oct 2028
Church Road Farm
Battery storage · Qair Renewables UK Limited
400 MWScoping South Anglia Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2034
Cilfynydd
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2030
Cilfynydd Green Energy Centre
Solar + storage · Cilfynydd Ng Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2029
Coachford 400MW BESS
Battery storage · Field Woodhead Ltd
400 MWScoping Coachford 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Cottam-Ryhall Solar & BESS
Solar + storage · Crh Renewables Limited
400 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Page 12 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.