NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Worksop BESS Battery storage · ARM Cedar Limited |
480 MW | Scoping |
| Noventum -Long Stratton Solar + storage · Noventum Power Solar 8 Limited |
460 MW | Scoping |
| Shoreham Gas · VPI Power Limited |
460 MW | |
| Caithness Energy Storage Battery storage · Baywa R.e. UK Limited |
456 MW | Scoping |
| Alderton PV & BESS Station Solar + storage · Bnrg Albion Limited |
450 MW | Scoping |
| Alyth Solar + storage · Ecodev (Alyth) Ltd |
450 MW | Scoping |
| Ayr Flexpower Solar + storage · Ayr Flexpower Limited |
450 MW | Scoping |
| Blyth BESS Battery storage · Sse Renewables Solar & Battery Holdings Limited |
450 MW | Scoping |
| Coylton 275kV Greener Grid Park Battery storage · Coylton Energy Limited |
450 MW | Scoping |
| Gateway Energy Centre Power Station Battery storage · Gateway Energy Centre Limited |
450 MW | Consents Approved |
| JG Pears Solar + storage · Jg Pears Grid Connection Limited |
450 MW | |
| Loch na Cathrach Pumped Storage Hydro Hydro and pumped storage · Statkraft Highlands Psh Limited |
450 MW | Consents Approved |
| New Cumnock BESS Solar + storage · New Cumnock BESS Ltd |
450 MW | Scoping |
| Ninfield Greener Grid Park Battery storage · Ninfield Grid Solutions Limited |
450 MW | Scoping |
| Yaxley GEC (Ethos Green) Solar + storage · Yaxley Green Energy Centre Ltd |
450 MW | Awaiting Consents |
| Neart Na Gaoithe Offshore Wind Farm Offshore wind · Neart Na Gaoithe Offshore Wind Limited |
448 MW | |
| Cdcl Gas · Uniper UK Limited |
445 MW | |
| Enfield Gas · Uniper UK Limited |
442 MW | |
| Cruachan U3&4 Replacement Hydro and pumped storage · Drax Pumped Storage Limited |
440 MW | |
| Hornsea Power Station 2A Offshore wind · Breesea Limited |
440 MW | |
| Hornsea Power Station 2B Offshore wind · Soundmark Wind Limited |
440 MW | |
| Hornsea Power Station 2C Offshore wind · Sonningmay Wind Limited |
440 MW | |
| Kell440Mw BESS Battery storage · Care Power (Kellingley) Limited |
440 MW | Scoping |
| Overton440Mw BESS Battery storage · Care Power (Overton) Limited |
440 MW | Scoping |
| Pollington Hybrid Solar + storage · Edf Energy Renewables Limited |
440 MW | Scoping |
| Indian Queens Solar + storage · Gridmove Ltd |
437 MW | Scoping |
| Staythorpe (BESS and PV) Solar + storage · Sse Staythorpe Power Limited |
437 MW | Consents Approved |
| Viking Wind Farm Onshore wind · Viking Energy Wind Farm LLP |
434 MW | |
| Kenwick Solar Solar · Anesco Limited |
431 MW | Scoping |
| Great Yarmouth Gas · RWE Generation UK Plc |
420 MW | |
| Noventum - Stocksbridge Battery storage · Noventum Power Solar 14 Limited |
410 MW | Scoping |
| Corby Gas · Corby Power Limited |
401 MW | |
| Alyth Energy Storage And Solar Solar + storage · Private Energy Partners (UK) Ltd |
400 MW | Scoping |
| Bicker Drove Battery storage · Rewe 1 Limited |
400 MW | Scoping |
| Bicker Fen Solar + storage · Ib Vogt UK Ltd |
400 MW | Scoping |
| Boom Power Feckenham Generation Hub Solar + storage · Wheaten Hill BESS Limited |
400 MW | Scoping |
| Borders Wind Farm Onshore wind · Edf Energy Renewables Limited |
400 MW | Scoping |
| Btgbbik01 - Bicker Fen 400Mw BESS Battery storage · Field Bicker Fen Ltd |
400 MW | Scoping |
| Capenhurst Solar + storage · Enso Green Holdings Q Limited |
400 MW | Scoping |
| Cellarhead Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Cellarhead Green Energy Centre Solar + storage · S & C Energy Limited |
400 MW | Awaiting Consents |
| Cellarhead PV & BESS Station Solar + storage · Ib Vogt UK Ltd |
400 MW | Scoping |
| Celtic Offshore Wind Farm Offshore wind · RWE Offshore Wind |
400 MW | Scoping |
| Chickerell Solar + storage · Enso Green Holdings X Limited |
400 MW | Awaiting Consents |
| Chickerell Solar PV & BESS Battery storage · Chickerell Storage Limited |
400 MW | Consents Approved |
| Church Road Farm Battery storage · Qair Renewables UK Limited |
400 MW | Scoping |
| Cilfynydd Solar + storage · Enso Green Holdings X Limited |
400 MW | Awaiting Consents |
| Cilfynydd Green Energy Centre Solar + storage · Cilfynydd Ng Limited |
400 MW | Awaiting Consents |
| Coachford 400MW BESS Battery storage · Field Woodhead Ltd |
400 MW | Scoping |
| Cottam-Ryhall Solar & BESS Solar + storage · Crh Renewables Limited |
400 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.