Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SPTBorders Wind Farm
Borders Wind Farm is a 400 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Borders Windfarm 132kV, with capacity due from May 2033. The connection agreement is held by Edf Energy Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001977
- Customer
- Edf Energy Renewables Limited
- Technology
- Wind Onshore
- Total capacity
- 400 MW
- Change in this agreement
- +400 MW
- Capacity effective from
- 30 May 2033
- Connection site
- Borders Windfarm 132kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem