JG Pears is a 450 MW solar + storage project built and connected, connecting to the National Grid (England & Wales) network at High Marnham 275kV Substation. The connection agreement is held by Jg Pears Grid Connection Limited.
Connection details
- NESO project number
- PRO-000250
- Customer
- Jg Pears Grid Connection Limited
- Technology
- CHP (Combined Heat and Power), Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 450 MW
- Already connected
- 30 MW
- Change in this agreement
- +420 MW
- Capacity effective from
- 31 October 2033
- Connection site
- High Marnham 275kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem