Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Kell440Mw BESS

Kell440Mw BESS is a 440 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Kellingley IDNO GSP, with capacity due from October 2035. The connection agreement is held by Care Power (Kellingley) Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003956
Customer
Care Power (Kellingley) Limited
Technology
Energy Storage System
Total capacity
440 MW
Change in this agreement
+440 MW
Capacity effective from
30 October 2035
Connection site
Kellingley IDNO GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Kellingley IDNO GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem