Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SHET

Caithness Energy Storage

Caithness Energy Storage is a 456 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Caithness Energy Storage 400Kv Substation, with capacity due from October 2034. The connection agreement is held by Baywa R.e. UK Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004933
Customer
Baywa R.e. UK Limited
Technology
Energy Storage System
Total capacity
456 MW
Change in this agreement
+456 MW
Capacity effective from
31 October 2034
Connection site
Caithness Energy Storage 400Kv Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Caithness Energy Storage · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem