Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETYaxley GEC (Ethos Green)
Yaxley GEC (Ethos Green) is a 450 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Yaxley 400kV Substation, with capacity due from October 2031. The connection agreement is held by Yaxley Green Energy Centre Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003935
- Customer
- Yaxley Green Energy Centre Ltd
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 450 MW
- Change in this agreement
- +450 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Yaxley 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The connection site could not be placed on the map.
Other projects at Yaxley 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem