Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Enfield

Enfield is a 442 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Brimsdown 132kV Substation. The connection agreement is held by Uniper UK Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000147
Customer
Uniper UK Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
442 MW
Already connected
442 MW
Connection site
Brimsdown 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Brimsdown Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem