Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETBicker Fen
Bicker Fen is a 400 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Trent Valley South Connection Node C 400kV Substation, with capacity due from October 2034. The connection agreement is held by Ib Vogt UK Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004295
- Customer
- Ib Vogt UK Ltd
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 400 MW
- Change in this agreement
- +400 MW
- Capacity effective from
- 30 October 2034
- Connection site
- Trent Valley South Connection Node C 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near Trent Valley South Connection Node C · Grid map
Other projects at Trent Valley South Connection Node C 400kV Substation
- NatPower Navenby Energy ParkBattery storage · 1.0 GW · Scoping
- Grantham Solar Farm - RSLSolar + storage · 810 MW · Scoping
- Elmya Foxdale BESSBattery storage · 800 MW · Scoping
- Grantham GenerationSolar + storage · 700 MW · Scoping
- Oak Holt SolarSolar + storage · 400 MW · Scoping
- Cranwell Solar & BESS FarmSolar + storage · 300 MW · Scoping
- Barnby Solar FarmSolar + storage · 250 MW · Scoping
- Noventum NavenbySolar + storage · 249 MW · Scoping
- CoddingtonBattery storage · 240 MW · Scoping
- Kinder PV & BESS StationSolar + storage · 240 MW · Scoping
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem