🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Grantham Solar Farm - RSL

Grantham Solar Farm - RSL is a 810 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Trent Valley South Connection Node C 400kV Substation, with capacity due from October 2034. The connection agreement is held by South Grantham Energy Centre Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005045
Customer
South Grantham Energy Centre Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
810 MW
Change in this agreement
+810 MW
Capacity effective from
30 October 2034
Connection site
Trent Valley South Connection Node C 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Trent Valley South Connection Node C · Grid map

Other projects at Trent Valley South Connection Node C 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem