United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESSolar interconnection queue in the USA (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Skylab Solar Solar · EDF Renewables Development, Inc. |
610 MW | In study |
| Sanborn 5 Hybrid Solar |
560 MW | Agreement signed |
| Tabor Solar Solar · Quanah Solar LLC |
506 MW | In study |
| Solar project GEN-2020-087, Comanche County Solar |
500 MW | In study |
| Baker Branch Solar Solar · Mockingbird Solar Center, LLC |
469 MW | Agreement signed |
| Dolphin Solar Solar · Dolphin Solar LLC |
450 MW | In study |
| Solar project GEN-2020-058, Finney County Solar |
425 MW | Agreement signed |
| Sequoia II Solar Solar · Deville Solar LLC |
418 MW | Agreement signed |
| Caliche Mound Solar Solar · Tierra Blanco Solar LLC |
407 MW | Agreement signed |
| Mineral Basin Solar Power Solar · Mineral Basin Solar Power, LLC |
402 MW | In study |
| Dorado Solar Solar · Enbridge Solar (Sequoia I), LLC |
401 MW | Agreement signed |
| Oak Run Solar Project Solar |
400 MW | Agreement signed |
| Oak Run Solar Project Solar |
400 MW | Agreement signed |
| Solar project G0651, Lake County Solar |
400 MW | In study |
| Hanson Solar Solar · Hanson Solar, LLC |
399 MW | Agreement signed |
| Charger Solar Solar · AP Solar 4, LLC |
397 MW | Agreement signed |
| Tormes Solar Solar · BDPU SOLAR TORMES LLC |
357 MW | Agreement signed |
| Chillingham Solar Solar · Chillingham Solar LLC |
352 MW | Agreement signed |
| Solar project GEN-2020-084, Burt County Solar |
350 MW | Agreement signed |
| Cantaloupe Solar Solar · Saragosa Del Sol Energy, LLC |
307 MW | Agreement signed |
| Pleasant Grove Solar Solar · Deriva Energy Solar, LLC |
300 MW | In study |
| Butterfly Meadows Solar · Butterfly Meadows Solar Project, LLC |
300 MW | In study |
| Solar project J1710, Lee County Solar |
300 MW | In study |
| Mammoth South Energy Center Solar |
300 MW | Agreement signed |
| Mammoth Central Energy Center Solar |
300 MW | Agreement signed |
| Solar project J1712, Perry County Solar |
300 MW | In study |
| Solar project J1836, Callaway County Solar |
300 MW | In study |
| Dawson Solar Solar · Deriva Energy Solar, LLC |
300 MW | In study |
| Mammoth Central II Energy Center Solar |
300 MW | Agreement signed |
| Burr Oak Solar Solar · Leeward Renewable Energy Development, LLC |
300 MW | In study |
| South Dixon Solar Solar · Deriva Energy Solar, LLC |
300 MW | In study |
| Solar project GEN-2020-054, Bowie County Solar |
298 MW | Agreement signed |
| Sandow Solar Solar · Sandow Lakes Ranch Solar I, LLC |
287 MW | In study |
| Beacon Solar Solar · Beacon Solar, LLC |
260 MW | In study |
| Mayapple Solar Solar |
260 MW | Agreement signed |
| Sierra Madre Solar Solar · Sierra Madre Solar LLC |
255 MW | In study |
| Gipper Solar Farm Solar · Gipper Solar Farm, LLC |
255 MW | In study |
| Pandora Solar Solar |
252 MW | Paused / redesign |
| Tanglewood Solar Solar · Brazoria Solar, LLC |
251 MW | Agreement signed |
| Samson Solar 3 Solar · Samson Solar Energy III LLC |
250 MW | Agreement signed |
| Solar project J1573, Portage County Solar |
250 MW | Agreement signed |
| Goldfinch Solar Solar · Goldfinch Solar, LLC |
250 MW | Agreement signed |
| Solar project GEN-2020-094, Otoe County Solar |
250 MW | Agreement signed |
| Solar project J1614, Muskegon County Solar |
250 MW | Agreement signed |
| Solar project J1840, Dewitt County Solar |
250 MW | In study |
| Iguala Solar Solar |
250 MW | Paused / redesign |
| Lavaca Bay Solar Solar · Lavaca Bay Solar Project, LLC |
244 MW | Agreement signed |
| Pluto Solar Solar |
228 MW | Paused / redesign |
| Solar project J1502, Juneau County Solar |
225 MW | Agreement signed |
| Solar project IC-908, Turner County Solar |
220 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)124 · 11.5 GW
- MISO (Midcontinent)71 · 11.0 GW
- ERCOT (Texas)47 · 10.9 GW
- Southeast (non-ISO utilities)35 · 3,304 MW
- SPP (Southwest Power Pool)10 · 2,343 MW
- West (non-ISO utilities)14 · 2,153 MW
- NYISO (New York)11 · 1,217 MW
- CAISO (California)2 · 685 MW
- ISO-NE (New England)4 · 129 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)