SOLAR · PJM

Burr Oak Solar

Burr Oak Solar is a 300 MW solar request in interconnection study in the PJM interconnection queue, in Dekalb County, Illinois, connecting to ComEd.

Queue statusIn planning
  1. PlanningQueued Aug 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AG1-118
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Developer
Leeward Renewable Energy Development, LLC
Connection point (POI)
Sugar Grove-Waterman 138kV
Location
Dekalb County, Illinois
Technology
Solar: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Active
Entered queue
31 August 2020
Proposed online date
December 2023

Location

Marker shows the centre of Dekalb County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Dekalb County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem