United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Texas (2019 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Topaz Power Plant Gas · Topaz Generating, LLC |
510 MW | |
| Young Wind Onshore wind · Young Wind, LLC |
499 MW | |
| Ash Creek Solar Solar · Ash Creek Solar LLC |
418 MW | |
| Apogee Wind Onshore wind · EDF Renewables Development, Inc. |
393 MW | |
| Hollywood Solar Solar · Red Tailed Hawk Solar LLC |
353 MW | |
| Tierra Bonita Solar Solar · Greasewood II LLC |
307 MW | |
| DeCordova BESS addition Other · Luminant Generation Company LLC |
263 MW | |
| Pisgah Ridge Solar Solar · Pisgah Ridge Solar, LLC |
254 MW | |
| Eiffel Solar Solar · Paris Farm Solar, LLC |
241 MW | |
| 7V Solar Solar · 7V Solar Ranch, LLC |
241 MW | |
| Azure Sky Solar Solar · Azure Sky Solar Project, LLC |
228 MW | |
| Mercury Solar Solar + storage · Mercury Solar, LLC |
206 MW | |
| Horizon Solar Solar · Horizon Solar, LLC |
204 MW | |
| SunRay Solar · AP Sunray LLC |
204 MW | |
| Aureola Solar Solar · Ben Milam Solar 1 |
203 MW | |
| Texas Solar Nova 2 Solar · TEXAS SOLAR NOVA 2, LLC |
201 MW | |
| Big Elm Solar Solar + storage · Big Elm Solar, LLC |
201 MW | |
| Queen Solar Phase II Solar |
200 MW | |
| Aguayo Wind Onshore wind · Castle Gap Wind Power |
196 MW | |
| Appaloosa Run Wind Onshore wind · Appaloosa Run Wind, LLC |
175 MW | |
| Ratliff (Concho Valley) Solar Solar · MERIT SI, LLC |
160 MW | |
| Sheep Creek Wind Onshore wind · Century Oak Wind Project, LLC |
153 MW | |
| Cottonwood Bayou Storage Battery storage · Cottonwood Bayou Storage, LLC |
153 MW | |
| Danish Fields Storage Battery storage · Danish Fields Storage, LLC |
152 MW | |
| Myrtle Storage Battery storage · Myrtle Storage, LLC |
151 MW | |
| Elara Solar Solar · Elara Energy Project, LLC |
132 MW | |
| Orange Grove Solar Solar + storage · Enbridge Solar (Orange Grove), LLC |
131 MW | |
| Vortex BESS Other · AZURE SKY WIND STORAGE LLC |
122 MW | |
| Galloway 2 Solar Solar · 224WB 8me LLC |
114 MW | |
| Silicon Hill Storage Other · KCE TX 12, LLC |
105 MW | |
| Spanish Crown Solar · BPL Crown Solar |
103 MW | |
| Golinda Solar Solar · BPL Sol Solar |
103 MW | |
| Gambit Batt Other · Gambit Energy Storage |
102 MW | |
| Grizzly Ridge Solar Solar + storage · Grizzly Ridge Solar LLC |
102 MW | |
| North Fork Energy Storage Other · North Fork Energy Storage |
101 MW | |
| Bat Cave Energy Storage Other · Bat Cave Energy Storage |
101 MW | |
| Eliza Storage Other · Ables Springs Storage, LLC |
100 MW | |
| Aquilla Lake 2 Wind Onshore wind · NextEra Energy |
100 MW | |
| Anchor Wind Onshore wind · Ranchland Wind Project,LLC |
98.9 MW | |
| Sand Bluff Wind Repower Onshore wind |
89.5 MW | |
| Odessa-Ector Unit 2 (Block 2) Uprate Repower Gas |
83.0 MW | |
| Odessa-Ector Unit 1 (Block 1) Uprate Gas · LA FRONTERA HOLDINGS LLC |
80.0 MW | |
| Azure Sky BESS Other · Azure Sky Solar Project, LLC |
77.6 MW | |
| Anchor BESS Other · Ranchland Wind Project,LLC |
71.5 MW | |
| Kellam Solar Solar · BT Kellam Solar, LLC |
59.8 MW | |
| Republic Road Storage Other · KCE TX 11, LLC |
51.8 MW | |
| Lily Storage Other · Lily Solar, LLC |
51.7 MW | |
| Roseland Storage Other · Enel Green Power Roseland Solar, LLC |
51.6 MW | |
| Endurance Park Storage Other · KCE TX 13, LLC |
51.5 MW | |
| River Valley Storage 2 Other · KCE TX 21, LLC |
51.5 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)