United States › Grid › Interconnection queues › Texas
GAS · ERCOTOdessa-Ector Unit 1 (Block 1) Uprate
Odessa-Ector Unit 1 (Block 1) Uprate is a 80.0 MW gas request built and operating in the ERCOT interconnection queue, in Ector County, Texas.
Request details
- Queue ID
- 19INR0206
- Grid region
- ERCOT (Texas)
- Developer
- LA FRONTERA HOLDINGS LLC
- Connection point (POI)
- 1020 Odessa EHV 345 kV
- Location
- Ector County, Texas
- Technology
- Gas: 80.0 MW
- Total requested
- 80.0 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 20 May 2019
- Proposed online date
- May 2019
- Came online
- June 2019
Location
Marker shows the centre of Ector County; the queue data does not give exact sites.
Other requests in Ector County
- Greyhound SolarSolar · 336 MW · agreement signed
- Sisters SolarSolar + storage · 302 MW · agreement signed
- Greyhound Solar - Phase ESolar · 151 MW · agreement signed
- Greyhound Solar - Phase FSolar · 102 MW · agreement signed
- Apple BESSBattery storage · 9.9 MW · agreement signed
- Gypsum Plains SolarSolar + storage · 503 MW · in study
- Velociraptor BESS IISolar + storage · 261 MW · in study
- Velociraptor BESS ISolar + storage · 261 MW · in study
- Van Zandt Energy StorageBattery storage · 257 MW · in study
- Velociraptor Solar IISolar + storage · 252 MW · in study
- Velociraptor Solar ISolar + storage · 252 MW · in study
- Gypsum Plains StorageSolar + storage · 211 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem