Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown427,533 MW
Active in queue7,091 MW42 requests
Agreement signed4,377 MW26 requests
Withdrawn7413.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

42 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Aviator Wind
Onshore wind · Apex Clean
525 MWOperating Coke, TXERCOT Dec 20172021
High Lonesome Wind
Onshore wind · Enel
450 MWOperating Crockett, TXERCOT Mar 20172021
TG East Wind
Onshore wind · Northrenew
336 MWOperating Knox, TXERCOT Apr 20172022
Prospero Solar***
Solar · Longroad Energy
300 MWOperating Andrews, TXERCOT Jun 20172020
Ranchero Wind
Onshore wind · Scout Clean Energy
300 MWOperating Crockett, TXERCOT Jun 20172019
Titan Solar
Solar · SE Titan, LLC
270 MWOperating Culberson, TXERCOT Oct 20172021
Greasewood Solar
Solar · Concho Bluff, LLC
255 MWOperating Pecos, TXERCOT Feb 20172021
Phoebe Solar
Solar · Longroad Energy
250 MWOperating Winkler, TXERCOT Jan 20172019
Galloway Solar
Solar · 8minutenergy
250 MWOperating Concho, TXERCOT Aug 20172021
Cranel Wind
Onshore wind · Eon
220 MWOperating Refugio, TXERCOT Sep 20172022
Vera Wind
Onshore wind · Longroad Energy
209 MWOperating Knox, TXERCOT Apr 20172021
McLean (Shakes) Solar
Solar · Cypress Creek Renewables
206 MWOperating Zavala, TXERCOT May 20172023
East Raymond Wind (El Rayo)
Onshore wind · Eon
202 MWOperating Willacy, TXERCOT Jan 20172021
Anson Solar 1
Solar · Anson Solar Center, LLC
202 MWOperating Jones, TXERCOT Jun 20172022
Morrow Lake Solar
Solar + storage · Morrow Lake Solar, LLC
201 MWOperating Frio, TXERCOT Dec 20172025
Montgomery Ranch Wind
Onshore wind · RWE Renewables Development, LLC
200 MWOperating Foard, TXERCOT Dec 20172024
Onshore wind project GEN-2017-033, Baylor County
Onshore wind
200 MWOperating Baylor, TXSPP May 20172024
Rambler Solar
Solar · Rambler Solar
200 MWOperating Tom Green, TXERCOT Aug 20172020
Queen Solar Phase I
Solar · Roadrunner Solar Project, LLC
200 MWOperating Upton, TXERCOT Jul 20172019
Impact Solar
Solar · IMPACT SOLAR 1 LLC
199 MWOperating Lamar, TXERCOT Dec 20172021
Aragorn Solar
Solar · IP Aragorn, LLC
187 MWOperating Culberson, TXERCOT May 20172021
Oberon Solar
Solar · OBERON SOLAR IA LLC
180 MWOperating Ector, TXERCOT May 20172020
Chalupa Wind
Onshore wind · Acciona
174 MWOperating Cameron, TXERCOT Dec 20172021
Gopher Creek Wind
Onshore wind · Terna Energy
158 MWOperating Borden, TXERCOT Jul 20172019
White Mesa Wind
Onshore wind · White Mesa Wind, LLC
152 MWOperating Crockett, TXERCOT Sep 20172022
Lily Solar
Solar · Lily Solar, LLC
148 MWOperating Kaufman, TXERCOT Mar 20172021
Nebula Solar
Solar · Rayos Del Sol Solar Project, LLC
138 MWOperating Cameron, TXERCOT Mar 20172022
Roadrunner Crossing Wind SLF
Wind + storage · Roadrunner Crossing Wind Farm, LLC
128 MWOperating Eastland, TXERCOT Sep 20172024
Coniglio Solar
Solar · BT Coniglio Solar, LLC
126 MWOperating Fannin, TXERCOT Nov 20172021
Wagyu Solar
Solar · Cypress Creek Renewables
120 MWOperating Brazoria, TXERCOT Feb 20172021
Rowland Solar I
Solar · Cutlass Solar LLC
102 MWOperating Fort Bend, TXERCOT Sep 20172023
Karankawa 2 Wind
Onshore wind · Avangrid
101 MWOperating San Patricio, TXERCOT May 20172019
Lignin (SJRR)
Gas · SJRR Power LLC
100 MWOperating Harris, TXERCOT Apr 20172022
Old Bloomington Road
Gas · Castleman Power
100 MWOperating Victoria, TXERCOT Apr 20172022
Blue Summit II
Wind + storage · Nextera
99.4 MWOperating Wilbarger, TXERCOT Nov 20172020
Phoenix Solar
Solar · G.S.E. ONE LLC
82.3 MWOperating Fannin, TXERCOT Jun 20172021
Longbow Solar
Solar · Longbow Solar, LLC
78.2 MWOperating Brazoria, TXERCOT Aug 20172024
Rippey Solar
Solar · BT Cooke Solar, LLC
59.8 MWOperating Cooke, TXERCOT Oct 20172020
Hidalgo II Wind
Onshore wind · EDP Renewables
51.0 MWOperating Hidalgo, TXERCOT Apr 20172021
Brightside Solar
Solar · Brightside Solar, LLC
50.0 MWOperating Bee, TXERCOT Feb 20172022
Gas project GEN-2016-177, Gaines County
Gas
17.0 MWOperating Gaines, TXSPP Jan 20172021
Capricorn IV repower
Onshore wind
9.0 MWOperating Sterling, TXERCOT Aug 20172025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)