United States › Grid › Interconnection queues › Texas
GAS · ERCOTOld Bloomington Road
Old Bloomington Road is a 100 MW gas request built and operating in the ERCOT interconnection queue, in Victoria County, Texas.
Request details
- Queue ID
- 19INR0057
- Grid region
- ERCOT (Texas)
- Developer
- Castleman Power
- Connection point (POI)
- 8143 Dupont 138kV
- Location
- Victoria County, Texas
- Technology
- Gas: 100 MW
- Total requested
- 100 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 17 April 2017
- Agreement signed
- 20 May 2020
- Proposed online date
- December 2021
- Came online
- January 2022
Location
Marker shows the centre of Victoria County; the queue data does not give exact sites.
Other requests in Victoria County
- Crossroads WindOnshore wind · 277 MW · agreement signed
- Leopard BESSBattery storage · 264 MW · agreement signed
- Oriana SolarSolar + storage · 181 MW · agreement signed
- Two Brothers ESSBattery storage · 152 MW · agreement signed
- Brizo BESSBattery storage · 141 MW · agreement signed
- Oriana BESSSolar + storage · 60.3 MW · agreement signed
- HyFuels Green Lake SolarSolar · 347 MW · in study
- HyFuels Calhoun SolarSolar · 302 MW · in study
- Marcos Solar SLFSolar + storage · 216 MW · in study
- Oak Belt StorageSolar + storage · 207 MW · in study
- Calico BESSBattery storage · 205 MW · in study
- Arpeggio BESSBattery storage · 201 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem