πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Longbow Solar

Longbow Solar is a 78.2 MW solar request built and operating in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusOperating
  1. PlanningQueued Aug 2017 (completed)
  2. ConsentedJan 2021 (completed)
  3. Construction (completed)
  4. OperatingApr 2024 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
20INR0026
Grid region
ERCOT (Texas)
Developer
Longbow Solar, LLC
Connection point (POI)
42110 Angelton - 42870 Liverpool 138kV
Location
Brazoria County, Texas
Technology
Solar: 78.2 MW
Total requested
78.2 MW
Study phase
IA
Queue status
Operational
Entered queue
15 August 2017
Agreement signed
6 January 2021
Proposed online date
April 2024
Came online
April 2024

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem