Interconnection queue in PJM (Mid-Atlantic, Midwest) (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown17816.6 GW
Active in queue16.6 GW178 requests
Agreement signed11.1 GW128 requests
Withdrawn71947.9 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

178 requests ยท page 1 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Fourth Quarter
Battery storage ยท Fourth Quarter BESS, LLC
500 MWAgreement signed Montgomery, MDPJM Oct 2020target 2030
Dolphin Solar
Solar ยท Dolphin Solar LLC
450 MWIn study Fountain, INPJM Sep 2020target 2024
West Lorain Power Plant 345 kV
Gas
406 MWAgreement signed Lorain, OHPJM Sep 2020target 2031
Oak Run Solar Project
Solar
400 MWAgreement signed Madison, OHPJM Aug 2020target 2030
Oak Run Solar Project
Solar
400 MWAgreement signed Madison, OHPJM Aug 2020target 2030
Pleasant Grove Solar
Solar ยท Deriva Energy Solar, LLC
300 MWIn study Mchenry, ILPJM Mar 2020target 2023
Butterfly Meadows
Solar ยท Butterfly Meadows Solar Project, LLC
300 MWIn study Van Wert, OHPJM Sep 2020target 2024
Mammoth South Energy Center
Solar
300 MWAgreement signed Pulaski, INPJM Mar 2020target 2027
Mammoth Central Energy Center
Solar
300 MWAgreement signed Pulaski, INPJM Mar 2020target 2027
Dawson Solar
Solar ยท Deriva Energy Solar, LLC
300 MWIn study Mclean, ILPJM Sep 2020target 2024
Mammoth Central II Energy Center
Solar
300 MWAgreement signed Pulaski, INPJM Sep 2020target 2028
Jade Meadow III Solar Facility
Solar + storage
300 MWAgreement signed Garrett, MDPJM Sep 2020target 2028
Burr Oak Solar
Solar ยท Leeward Renewable Energy Development, LLC
300 MWIn study Dekalb, ILPJM Aug 2020target 2023
South Dixon Solar
Solar ยท Deriva Energy Solar, LLC
300 MWIn study Lee, ILPJM Mar 2020target 2022
Beacon Solar
Solar ยท Beacon Solar, LLC
260 MWIn study Rock Island, ILPJM Sep 2020target 2023
Mayapple Solar
Solar
260 MWAgreement signed Pulaski, INPJM Sep 2020target 2027
Gipper Solar Farm
Solar ยท Gipper Solar Farm, LLC
255 MWIn study Whiteside, ILPJM Oct 2020target 2023
Goldfinch Solar
Solar ยท Goldfinch Solar, LLC
250 MWAgreement signed Mason, KYPJM Feb 2020target 2030
Woods Landing Energy Storage
Battery storage
250 MWAgreement signed Atlantic, NJPJM Mar 2020target 2030
Honey Creek Solar
Solar + storage
200 MWAgreement signed White, INPJM Feb 2020target 2027
Warren County Wind Energy Center
Onshore wind
200 MWAgreement signed INPJM Sep 2020target 2028
Moss Creek Solar
Solar
200 MWAgreement signed Pulaski, INPJM Mar 2020target 2027
Steward Creek Solar
Solar ยท Steward Creek Solar, LLC
200 MWIn study Lee, ILPJM Mar 2020target 2023
Prairie Creek Wind
Onshore wind ยท Prairie Creek Wind, LLC
200 MWAgreement signed Blackford, INPJM Mar 2020target 2029
Teays River Wind Farm
Onshore wind ยท Teays River Wind Farm LLC f/k/a Blackford County Wind Farm LLC
200 MWIn study Blackford, INPJM Mar 2020target 2023
Cass County Solar
Solar + storage ยท Steelhead Solar, LLC
200 MWIn study Cass, MIPJM Mar 2020target 2023
Riverbank Energy
Battery storage ยท Lincoln Reserve Energy, LLC
200 MWIn study Cook, ILPJM Mar 2020target 2024
CPV Backbone Solar
Solar
175 MWAgreement signed Garrett, MDPJM Mar 2020target 2025
Courthouse Solar
Solar ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
167 MWIn study Charlotte, VAPJM Mar 2020target 2031
French Creek Solar and BESS
Solar + storage ยท French Creek Energy, LLC
150 MWAgreement signed Erie, PAPJM Sep 2020target 2029
Palomino Solar
Solar
150 MWAgreement signed Highland, OHPJM Aug 2020target 2027
Pulaski Solar
Solar
150 MWAgreement signed Pulaski, VAPJM Jan 2020target 2028
Bright Stalk Generating Facility
Solar ยท Lexington Chenoa Wind Farm LLC
150 MWIn study Mclean, ILPJM Mar 2020target 2022
Osagrove Flats Solar
Solar ยท Aurora Solar LLC
150 MWIn study Lasalle, ILPJM Mar 2020target 2023
Two Rivers Storage
Battery storage
150 MWAgreement signed Hudson, NJPJM Mar 2020target 2028
Otter Creek Solar
Solar ยท Aurora Solar LLC
150 MWIn study Lasalle, ILPJM Mar 2020target 2023
Rosegold Solar
Solar ยท Leeward Renewable Energy Development, LLC
150 MWIn study Blackford, INPJM Jan 2020target 2022
Deep Lake Solar
Solar
150 MWAgreement signed Nicholas, WVPJM Mar 2020target 2029
Gemstone Solar
Solar
150 MWAgreement signed Cass, MIPJM Jan 2020target 2028
Exie Solar
Solar ยท Exie Solar, LLC
150 MWAgreement signed Green, KYPJM Sep 2020target 2028
Kankakee Solar
Solar ยท AEUG Kankakee Solar, LLC
144 MWIn study Kankakee, ILPJM Feb 2020target 2021
Magley Solar Energy Center
Solar
135 MWAgreement signed Adams, INPJM Sep 2020target 2029
South Branch Solar
Solar
130 MWAgreement signed Hancock, OHPJM Mar 2020target 2026
Harvey Solar I
Solar
128 MWAgreement signed Licking, OHPJM Jun 2020target 2029
Quarter Horse Solar
Solar ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
125 MWAgreement signed Charlotte, VAPJM Sep 2020target 2031
Bluestem Solar
Solar ยท RWE Solar Development, LLC
125 MWIn study Laporte, INPJM Sep 2020target 2023
Bluestem Solar
Solar
125 MWAgreement signed Laporte, INPJM Mar 2020target 2027
Canal Road
Solar
120 MWAgreement signed Wayne, OHPJM Mar 2020target 2027
Rainbow Trout
Solar + storage
120 MWAgreement signed Tippecanoe, INPJM Sep 2020target 2028
Union Ridge Solar
Solar
108 MWAgreement signed Licking, OHPJM Feb 2020target 2026
Page 1 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)