United States › Grid › Interconnection queues › Maryland

SOLAR + STORAGE · PJM

Jade Meadow III Solar Facility

Jade Meadow III Solar Facility is a 300 MW solar + storage request with a signed interconnection agreement in the PJM interconnection queue, in Garrett County, Maryland, connecting to APS.

Queue statusConsented
  1. PlanningQueued Sep 2020 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2028 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AG1-363
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Black Oak-Hatfield 500 kV
Location
Garrett County, Maryland
Technology
Solar: 300 MW · Battery
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Active
Entered queue
30 September 2020
Proposed online date
March 2028

Location

Marker shows the centre of Garrett County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Garrett County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem