United States › Grid › Interconnection queues › Maryland
SOLAR · PJMCPV Backbone Solar
CPV Backbone Solar is a 175 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Garrett County, Maryland, connecting to APS.
Queue statusConsented
- PlanningQueued Mar 2020 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Aug 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AF2-356
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Albright-Mt. Zion 138 kV
- Location
- Garrett County, Maryland
- Technology
- Solar: 175 MW
- Total requested
- 175 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 31 March 2020
- Proposed online date
- August 2025
Location
Marker shows the centre of Garrett County; the queue data does not give exact sites.
Other requests in Garrett County
- Jade Meadow III Solar FacilitySolar + storage · 300 MW · agreement signed
- CPV Wilson SolarSolar · 200 MW · in study
- Kelso Gap WFOnshore wind · 100 MW · built
- Four Mile Ridge WF - 24 WTOnshore wind · 60.0 MW · built
- Roth Rock WFOnshore wind · 50.0 MW · built
- Fair Wind ProjectOnshore wind · 30.0 MW · built
- Kelso Gap WFOnshore wind · 20.0 MW · built
- Gas project D05_W17, Garrett CountyGas · 432 MW · withdrawn
- Garrett County Wind FacilityOnshore wind · 69.1 MW · withdrawn
- Winding Ridge Wind FarmOnshore wind · 60.0 MW · withdrawn
- Solar + storage project AG1-078, Garrett CountySolar + storage · 60.0 MW · withdrawn
- Onshore wind project N29, Garrett CountyOnshore wind · 40.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem