Kelso Gap WF

Kelso Gap WF is a 100 MW onshore wind request built and operating in the PJM interconnection queue, in Garrett County, Maryland, connecting to APS.

Queue statusOperating
  1. PlanningQueued Jan 2002 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2006 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
H23_W70
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Kelso Gap 138 kV
Location
Garrett County, Maryland
Technology
Wind: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
30 January 2002
Proposed online date
October 2010
Came online
November 2006

Location

Marker shows the centre of Garrett County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Garrett County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem