United States › Grid › Interconnection queues › Maryland

ONSHORE WIND · PJM

Kelso Gap WF

Kelso Gap WF is a 20.0 MW onshore wind request built and operating in the PJM interconnection queue, in Garrett County, Maryland, connecting to APS.

Queue statusOperating
  1. PlanningQueued Jul 2003 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2006 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
K28
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Kelso Gap 138kV
Location
Garrett County, Maryland
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 July 2003
Proposed online date
October 2010
Came online
November 2006

Location

Marker shows the centre of Garrett County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Garrett County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem