United States › Grid › Interconnection queues › Illinois
BATTERY STORAGE · PJMRiverbank Energy
Riverbank Energy is a 200 MW battery storage request in interconnection study in the PJM interconnection queue, in Cook County, Illinois, connecting to ComEd.
Queue statusIn planning
- PlanningQueued Mar 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AF2-441
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Lincoln Reserve Energy, LLC
- Connection point (POI)
- Burnham 138kV
- Location
- Cook County, Illinois
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Active
- Entered queue
- 31 March 2020
- Proposed online date
- May 2024
Location
Marker shows the centre of Cook County; the queue data does not give exact sites.
Other requests in Cook County
- Calumet BESSBattery storage · 20.0 MW · agreement signed
- Battery storage project AI1-155, Cook CountyBattery storage · 110 MW · in study
- Battery storage project AH1-673, Cook CountyBattery storage · 85.0 MW · in study
- Battery storage project AH2-205, Cook CountyBattery storage · 10.0 MW · in study
- Battery storage project AH2-206, Cook CountyBattery storage · 10.0 MW · in study
- River Energy CenterGas · 27.0 MW · built
- City SolarSolar · 9.0 MW · built
- Gas project AC1-067, Cook CountyGas · 1,254 MW · withdrawn
- Battery storage project AG1-298, Cook CountyBattery storage · 500 MW · withdrawn
- Southeast Chicago Energy Project (aka SCEP)Gas · 296 MW · withdrawn
- Gas project J648, Cook CountyGas · 296 MW · withdrawn
- Battery storage project J3008, Cook CountyBattery storage · 270 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem