United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

SOLAR Β· PJM

City Solar

City Solar is a 9.0 MW solar request built and operating in the PJM interconnection queue, in Cook County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Aug 2011 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 2013 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
X3-005
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Wildwood 12kV
Location
Cook County, Illinois
Technology
Solar: 9.0 MW
Total requested
9.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
8 August 2011
Proposed online date
June 2013
Came online
September 2013

Location

Marker shows the centre of Cook County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Cook County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem