River Energy Center

River Energy Center is a 27.0 MW gas request built and operating in the PJM interconnection queue, in Cook County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Mar 2008 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2013 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
U1-054
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Calumet
Location
Cook County, Illinois
Technology
Gas: 27.0 MW
Total requested
27.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
26 March 2008
Proposed online date
March 2008
Came online
January 2013

Location

Marker shows the centre of Cook County; the queue data does not give exact sites.