BATTERY STORAGE Β· MISOBattery storage project J3008, Cook County
Battery storage project J3008, Cook County is a 270 MW battery storage request withdrawn in the MISO interconnection queue, in Cook County, Illinois, connecting to NORTHERN INDIANA PUBLIC SERVICE COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3008
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN INDIANA PUBLIC SERVICE COMPANY
- Connection point (POI)
- Sheffield - Burnham 345 (Tie line between CE and NIPS, NIPS owns 1.87 miles)
- Location
- Cook County, Illinois
- Technology
- Battery: 270 MW
- Total requested
- 270 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 August 2022
- Proposed online date
- May 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Cook County; the queue data does not give exact sites.
Other requests in Cook County
- Calumet BESSBattery storage Β· 20.0 MW Β· agreement signed
- Riverbank EnergyBattery storage Β· 200 MW Β· in study
- Battery storage project AI1-155, Cook CountyBattery storage Β· 110 MW Β· in study
- Battery storage project AH1-673, Cook CountyBattery storage Β· 85.0 MW Β· in study
- Battery storage project AH2-205, Cook CountyBattery storage Β· 10.0 MW Β· in study
- Battery storage project AH2-206, Cook CountyBattery storage Β· 10.0 MW Β· in study
- River Energy CenterGas Β· 27.0 MW Β· built
- City SolarSolar Β· 9.0 MW Β· built
- Gas project AC1-067, Cook CountyGas Β· 1,254 MW Β· withdrawn
- Battery storage project AG1-298, Cook CountyBattery storage Β· 500 MW Β· withdrawn
- Southeast Chicago Energy Project (aka SCEP)Gas Β· 296 MW Β· withdrawn
- Gas project J648, Cook CountyGas Β· 296 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem