United States › Grid › Interconnection queues › Illinois

GAS · PJM

Southeast Chicago Energy Project (aka SCEP)

Southeast Chicago Energy Project (aka SCEP) is a 296 MW gas request withdrawn in the PJM interconnection queue, in Cook County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. ConsentedSep 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-507
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Calumet 138 kV
Location
Cook County, Illinois
Technology
Gas: 296 MW
Total requested
296 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
30 September 2020
Agreement signed
30 September 2022
Proposed online date
June 2024
Withdrawn
January 2024

Location

Marker shows the centre of Cook County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Cook County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem