United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore wind Offshore wind |
1,309 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
882 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
529 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
402 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
326 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
326 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
305 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
301 MW | Withdrawn / abandoned |
| Battery Storage Increase (QP1238) Battery storage |
301 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
289 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
289 MW | Withdrawn / abandoned |
| Battery Storage Addition Battery storage |
284 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
271 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
263 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
262 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
257 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
250 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
241 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
233 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
226 MW | Withdrawn / abandoned |
| Solar Solar |
218 MW | Withdrawn / abandoned |
| Wind Onshore wind |
217 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
201 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Wind Onshore wind |
197 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
197 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
196 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
190 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
180 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
176 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
175 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
172 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
160 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
156 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Battery Storage Increase (QP1362) Battery storage |
141 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
139 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
136 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
135 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 Β· 198.6 GW
- West (non-ISO utilities)547 Β· 166.5 GW
- SPP (Southwest Power Pool)336 Β· 71.5 GW
- NYISO (New York)138 Β· 40.7 GW
- Southeast (non-ISO utilities)331 Β· 40.7 GW
- ERCOT (Texas)85 Β· 16.1 GW
- ISO-NE (New England)119 Β· 15.7 GW
- MISO (Midcontinent)10 Β· 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 Β· 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)