United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OFFSHORE WIND Β· ISO-NE

Offshore Wind

Offshore Wind is a 882 MW offshore wind request withdrawn in the ISO-NE interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1361
Grid region
ISO-NE (New England)
Connection point (POI)
RIE, Jepson 115 kV Substation
Location
Massachusetts
Technology
Offshore Wind: 882 MW
Total requested
882 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
24 February 2023
Proposed online date
February 2030
Withdrawn
September 2023

Location

No county location in the queue data.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem