Battery Storage

Battery Storage is a 156 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1351
Grid region
ISO-NE (New England)
Connection point (POI)
Owner: UI, Substation: Singer 345 kV
Location
Fairfield County, Connecticut
Technology
Battery: 156 MW
Total requested
156 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
6 February 2023
Proposed online date
October 2027
Withdrawn
October 2025

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Fairfield County