Battery Storage

Battery Storage is a 152 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1440
Grid region
ISO-NE (New England)
Connection point (POI)
The Primary Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property connecting to Eversource T line 1314 (Agawam to Chicopee) at 115 KV. The POI substation would be 3.
Location
Hampden County, Massachusetts
Technology
Battery: 152 MW
Total requested
152 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
18 September 2023
Proposed online date
May 2027
Withdrawn
April 2025

Location

Marker shows the centre of Hampden County; the queue data does not give exact sites.