United States › Grid › Interconnection queues › Massachusetts
SOLAR · ISO-NEWilbraham substation - NG Western MA Area Cluster Study
Wilbraham substation - NG Western MA Area Cluster Study is a 4.0 MW solar request built and operating in the ISO-NE interconnection queue, in Hampden County, Massachusetts, connecting to NGRID.
Request details
- Queue ID
- 867
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NGRID
- Connection point (POI)
- NG Wilbraham substation
- Location
- Hampden County, Massachusetts
- Technology
- Solar: 4.0 MW
- Total requested
- 4.0 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 21 March 2019
- Proposed online date
- December 2020
Location
Marker shows the centre of Hampden County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Hampden County
- West Springfield 45 MW BESSBattery storage · 45.0 MW · agreement signed
- Battery StorageBattery storage · 250 MW · in study
- Battery StorageBattery storage · 170 MW · in study
- Belchertown Substation - NG Western MA Area Cluster StudySolar · 8.0 MW · built
- Mass Power IncreaseGas · 5.0 MW · built
- Holiday Hill Community WindOnshore wind · 5.0 MW · built
- Indian River PowerHydro · 1.3 MW · built
- Cresent Hydroelectric Project UprateHydro · 0.7 MW · built
- Combined CycleGas · 837 MW · withdrawn
- CC Administrative IncreaseGas · 550 MW · withdrawn
- Combined cycle (alt to Q442/472)Gas · 431 MW · withdrawn
- Combined CycleGas · 388 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem